Arietta PRO001MX30 Instrukcja Obsługi Strona 15

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 47
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 14
15
Installation Instructions
Wall Mount Installation
WARNING - The following instructions are intended for drywall only, please note that when installing to concrete/masonry
additionalwallfasteneranchors(notprovided)shallbeused
Note:seebelowifcabinetinstallationispreferred
4.Afterthehoodinstallationheighthasbeendetermineddrawahorizontallineatadistanceabovethecooktopequaltothe
desiredhoodinstallationheightplus10”.
5.Findthecenterlineofthecooktop.Drawaverticallinealongthiscenterlineuptothehorizontallinedrawninstep1and
drawaverticallinerightandleftatadistanceof11-59/64"(for36"model)or8-15/16”(for30"model)todeterminethe
mounting location of the mounting hooks shipped with the hood.
6. Fit two mounting hooks on the wall to hang the hood through the provided slots
(2hooks+2screws5x35).
7.Run8”Duct,longenoughtoreachthetransitiononcethehoodhasbeeninstalledplus
11/2”inchtoconnectductwork.FixDucttotransitionwithscrewsandsealwithtape.
8.Remove1of2knockoutsandinstall1/2”conduitconnectorinj-box.
9. Hang the hood and adjust its position through the screws on the hooks.
10.Fixthehoodto4additionalpoint,2onupperside,2onlowerside(use4washers+4screws5x35.
Cabinet Installation:
4. Find the centerline of the cabinet bottom. Draw a line along this centerline from rear to front of the cabinet.
5.Drawtwolines,oneataKdistancefromthewall,theotheroneataZdistancefromthepreviousline.
Mark 4 points , two along each line at a distance of half W from the center line, to determine the screw locations.
6.Fit4screwsoncabinetbottomdonottightencompletelybutleaveaspaceofabout1/2”fromcabinetbottomsurface
and head screws.
7.Run8”Duct,longenoughtoreachthetransitiononcethehoodhasbeeninstalledplus11/2”inchforconnectductwork.
8.Remove1of2knockoutsandinstall1/2”conduitconnectorinj-box.
9. Hang the hood on screws through side slots provided on hood top.
Tighten the four screws.
Note:Ifpossiblexthehoodonthewallat4additionalpoint(2onupperside,2onlowerside).
10.From the inside of the cabinet attach the transition on upper outlet.
FixDucttotransitionandsealwithtape.
11 59/6411 59/64
10“
7/16“
8
13
/16
W
Z
K
8 1/4
18
8 15/168 15/16
10“
7/16“
8
13
/16
W
Z
K
8 1/4
18
Przeglądanie stron 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 46 47

Komentarze do niniejszej Instrukcji

Brak uwag